可能因为您的浏览器不支持样式,您可以更新您的浏览器到最新版本,以获取对此功能的支持,访问下面的网站,获取关于浏览器的信息:
[1] Shan-shan Chung,Carlos W.H.Lo. Evaluating sustainability in waste management:the case of construction and demolition,chemical and clinical wastes in Hong Kong[J].Resources,Conservation and Recycling,2003,37(2):119-145.
[2] 陆凯安.我国建筑垃圾的现状与综合利用[J].施工技术,1999,28(5):44-45.
[3] Bruce Mcdonald,Mark Smithers.Implementing a waste management plan during the construction phase of a project:a case study [J].Construction Management and Economics,1998,16(1):71-78.
[4] 沈泽勋.施工企业在项目管理中应加强对建筑施工垃圾管理[J].中国科技信息,2005(18):90-95.
[5] 张雪丽.从施工环节控制建筑垃圾的探讨[J].节能与环保,2008(1):102-103.
[6] 王家远,康香萍,申立银等.建筑废料减量化管理措施研究[J].华中科技大学学报(城市科学版),2004,21(3):26-33.
[7] C.S.Poon,Ann T.W.Yu,L.Jaillon.Reducing building waste at construction sites in Hong Kong[J].Construction Management and Economics,2004,22(5):461-470.
[8] 罗清海,陈晓明,王衍金等.工程建筑垃圾处置的调查和分析[J].中国资源综合利用,2009,27(6):29-31.
[9] Andrew R.J.Dainty,Richard J.Brooke.Towards improved construction waste minimisation:a need for improved supply chain integration?[J].Structural Survey,2004,22(1):20-29.
[10] Vivian W.Y.Tam,L.Y.Shen,C.M.Tam.Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations[J]. Building and Environment,2007(42): 1471-1477.
[11]B BB.A.G.Bossink,H.J.H.Brouwers.Construction waste:Quantification and source evaluation[J].Journal of construction engineering and management,1996,122(1):55-60.
[12] Carlos T.Formoso,et al.Material Waste in Building Industry:Main Causes and Prevention[J].Journal of Construction Engineering and Management,2002,128(4):316-325.
[13] 臧 鹏.施工过程中对建筑垃圾的控制探讨[J].现代商贸工业,2009(1):66-67.
[14]B BChi Sun Poon,et al.Management of construction waste in public housing projects in Hong Kong[J].Construction Management and Economics,2004,22(7):675-689.
[15] C.S.Poon,Ann T.W.Yu,L.H.Ng.On-site sorting of construction and demolition waste in Hong Kong[J].Resources,Conservation and Recycling,2001,32(2):157-172.
[16] 郝建丽,陈顺甜,吴海燕等.建筑废弃物的综合减量化措施[J].重庆环境科学,2003,25(11):10-12.
[17] 吴贤国,李惠强,杜 婷.建筑施工废料的数量、组成与产生原因分析[J].华中科技大学学报,2000,28(12):96-100.
[18] Udayangani Kulatunga,Dilanthi Amaratunga,Richard Haigh.Attitudes and perceptions of construction workforce on construction waste in Sri Lanka[J]. Management of Environmental Quality,2006,17(1):57-72.
[19] John Saunders,Peter Wynn.Attitudes towards waste minimisation amongst labour only sub-contractors[J]. Structural Survey,2004,33(3):148-155.
[20] C.S.Poon,T.W.Yu,L.H.Ng.A Guide For Managing And Minimizing Building And Demolition Waste[R]. Hong Kong:The Hong Kong Polytechnic University,2001.
[21] Vivian W.Y.Tam,C.M.Tam.Waste reduction through incentives:a case study[J].Building research and information,2008,36(1):37-43.